8 October 2026 · 7 min read
The STS readiness checklist: what to verify before vessels come alongside
An STS operation is won or lost before the vessels come alongside. Most incidents and delays trace back to something that could have been verified in advance. This checklist sets out what a disciplined readiness review covers.

Compatibility
Start with the vessels themselves.
- Size and freeboard difference — at the start, middle and end of the transfer
- Manifold positions, sizes and reducers
- Mooring arrangements and fairlead positions
- Cargo compatibility, including temperature and pressure for gas cargoes
The plan
A written operation plan is required for oil tankers under MARPOL Annex I and is good practice for every STS operation. It should be specific to the operation, not a generic template. Industry guidance such as the OCIMF/CDI/ICS/SIGTTO Ship to Ship Transfer Guide is the reference most plans are built on.
- Roles and the person in overall advisory control
- Approach, mooring, transfer and unmooring procedures
- Operating limits and stop criteria
- Emergency procedures and contacts
People
Confirm that the people supervising and carrying out the operation have the relevant experience and have been briefed on this specific plan.
Equipment
- Fenders: type, size, number and condition
- Hoses: type, length, test certificates and condition
- Mooring lines and equipment in good order
- Communications tested between vessels and support craft
Conditions
Check the forecast against the agreed limits, and keep monitoring. If conditions move outside the limits, stop. A delayed operation costs money; an incident costs far more.
The honest question
The final readiness question is simple: if something is not ready, will anyone say so? At J LINE our mandate is zero casualties, zero accidents and excellent service. Where conditions are unsafe, we identify what must change before proceeding.